Project Description
PROJECT
Arbor Lancaster Gate
Paton Developments’ QS team worked closely with the lead architects, De Matos Ryan, in planning the total refurbishment of the hotel.
Paton’s Head of Interior Design liaised with the architects’ design team to ensure that all layouts and interior finishes matched the exacting specifications.
The work, which was carried out whilst the hotel was operational, included: a new reception, bar and breakfast restaurant and the refurbishment of all customer areas, including the entirety of the hotel’s 40 bedrooms and suites.